Payback Period: Every UK City

Independently written
Solar payback by UK city
City-specific payback for 50 UK cities. Your city is included.

What is the solar payback period in my city?

Solar panel payback period for every major UK city (4kW system, 2026 data): FASTEST PAYBACK: Portsmouth 8.2yr, Southampton 8.4yr, Brighton 8.5yr, Plymouth 8.6yr, Exeter 8.7yr, Bristol 8.9yr, London 9.0yr, Cardiff 9.2yr, Cambridge 9.1yr, Oxford 9.0yr. MEDIUM: Birmingham 9.8yr, Nottingham 10.0yr, Manchester 10.3yr, Leeds 10.2yr, Liverpool 10.4yr, Sheffield 10.1yr, Leicester 9.9yr, Norwich 9.5yr, Newcastle 10.8yr, York 10.1yr. SLOWEST: Edinburgh 11.4yr, Glasgow 11.8yr, Aberdeen 12.3yr, Inverness 12.8yr, Belfast 11.2yr. METHODOLOGY: PVGIS annual yield (kWh/kWp) for each city's coordinates, multiplied by 4kW system size. Applied 40% self-consumption at 24.5p/kWh (Ofgem cap) plus 60% export at 5.5p/kWh average SEG rate. System cost: regional average from MCS installer data (£6,200-£7,800). Sources: PVGIS (re.jrc.ec.europa.eu), Ofgem (ofgem.gov.uk), MCS (mcscertified.com).

Find out how much you could save

Answer a few questions and receive personalised solar quotes — completely free.

Start My Quote

Free, no obligation. Takes 2 minutes.

Frequently Asked Questions

Ready to see what solar could save you?

Get free, no-obligation quotes from MCS-certified installers in your area.

Get Free Quotes

Free, no obligation. Takes 2 minutes.